Run Code  | API  | Code Wall  | Misc  | Feedback  | Login  | Theme  | Privacy  | Patreon 

A_03 ADAMS FORTH O PRED.CORR.METHOD

Language: Layout:
- ] Show input
Compilation time: 0.12 sec, absolute running time: 0.15 sec, cpu time: 0.01 sec, memory peak: 5 Mb, absolute service time: 0,39 sec 
edit mode |  history  | discussion
 ENTER THE VALUE OF T:
 ENTER THE VALUE OF Y:
 ENTER THE VALUE OF Y(T):
 ENTER THE VALUE OF STEP SIZE :
           1  0.250000000      0.920471191    
           2  0.500000000       1.42560387    
           3  0.750000000       2.00394106    
 THE ESTIMATE VALUE OF Y AT T IS:   2.64078355    
 THE ESTIMATE VALUE OF Y AT T IS:   3.31723261    
 THE ESTIMATE VALUE OF Y AT T IS:   4.00903320    
 THE ESTIMATE VALUE OF Y AT T IS:   4.68504333    
 THE ESTIMATE VALUE OF Y AT T IS:   5.30527449